Please use this identifier to cite or link to this item:
https://ipweaqbackup.intersearch.com.au/ipweaqjspui/handle/1/2836| Type: | PowerPoint |
| Title: | National Building Information Modelling Initiative |
| Authors: | Building Smart Australasia |
| Tags: | BIM;buildSMART |
| Issue Date: | Jun-2012 |
| Copyright year: | 2012 |
| Publisher: | buildingSMART |
| Abstract: | The report Getting it Right The First Time: A Plan to Reverse Declining 1 Standards in Project Design Documentation within the Building and Construction Industry (Engineers Australia, 2005) identified that a declining standard of documentation in the building, engineering and construction industry in Queensland over twelve to fifteen years to 2005 had led to losses exceeding $2 billion per annum in the Queensland construction budget – and probably six times that amount or $12 billion per annum nationwide. The above report found that poor documentation was leading to: _ An inefficient, non-competitive industry; _ Cost overruns, rework, extensions of time; _ High stress levels, loss of morale, reduced personal output; _ Adversarial behaviour, diminished reputations; and _ A decline in safety standards. |
| Description: | Report |
| URI: | http://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/2836 |
| Appears in Collections: | BIM Specific Documents |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| NationalBIMIniativeReport_6June2012.pdf | Report | 3.87 MB | Adobe PDF | ![]() View/Open |
Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.
