Please use this identifier to cite or link to this item: https://ipweaqbackup.intersearch.com.au/ipweaqjspui/handle/1/8101
Full metadata record
DC FieldValueLanguage
dc.contributor.authorRyan, Jason-
dc.date.accessioned2023-11-01T04:12:16Z-
dc.date.available2023-11-01T04:12:16Z-
dc.date.copyright2023en_US
dc.date.issued2023-
dc.identifier.urihttps://drive.google.com/file/d/1Z_2O9Zhj0lMdBFcrIBnGm5Yz4qli_1gC/view?usp=sharing-
dc.description.abstractBridges and other structures are key asset elements in the transport network. In Australia, around 800 organisations are responsible for more than 50,000 public road bridges. State Road Authorities (SRA’s) who are responsible for the high-capacity arterial roads manage more than 20,000 bridges, with local councils typically managing the remaining local roads with approximately 30,000 bridges. It is vital that the condition of each bridge monitored and essential repairs are planned and completed in an efficient and timely manner. Each State Road Authority (SRA) has their own systematic inspection, condition rating and monitoring system to identify maintenance needs, assess the effectiveness of treatments, model patterns of deterioration and forecast future maintenance, rehabilitation and replacement budget needs. Each SRA has its own customs and standards related to bridge inspection and asset management. Level 1 bridge inspections are undertaken every six to twelve months, whereas Level 2 bridge inspections are undertaken at varying schedules, typically in accordance with the risk rating of each structure. The typical frequencies for each SRA range from 2 to 5 years depending on the structure condition score. The typical bridge inspection nomenclature is outlined as follows: Level 1 • Inspections are high-level visual inspections to ensure there are no gross deformities present and are typically undertaken every 6-12 months Level 2 • Inspections involve visual inspection of all bridge surfaces and components and should take place based on the risk associated with each bridge structure however, typically should not exceed five year intervals Level 3 • Inspections are detailed engineering inspections, including material sampling and structural modelling, generally undertaken by exception When specific issues are identified during Level 1 and/or Level 2 bridge inspections, a Level 3 bridge inspection may be required to assess the bridge condition in more detail, as well as allow future assessment of the bridge load rating / structural capacity. With the 21st century move towards “digital twins” JJ Ryan Consulting have adopted Lab 55000 as our preferred Bridge Information Model (BIM) asset management and data recording program. This system was selected as it can be utilised to record the outcomes of each bridge inspection and allows traceability between inspections so that deterioration can be monitored and tracked without losing historical paperwork or having to delve through old reports. A picture tells a thousand words, and in this day and age of competing for Commonwealth and State government funding, a simple BIM system can be used to demonstrate why a bridge should be prioritised for repair, rehabilitation or replacement funding. This presentation demonstrates how BIM can be used to track individual component scores and provide a platform for 3D interrogation of the data by decision makers.en_US
dc.publisherInstitute of Public Works Engineering Australasia Queensland & Northern Territoryen_US
dc.subjectAsset Managementen_US
dc.titleAdopting bridge information models (BIM) to consistently record data, minimising risk and life cycle costsen_US
dc.typeAudio Visual Recordingen_US
Appears in Collections:2023 Annual Conference Gold Coast - Audiovisual Presentations

Files in This Item:
File Description SizeFormat  
231004_IPWEA QNT Paper - Adopting BIM v1.0.pdf3.35 MBAdobe PDFThumbnail
View/Open
23. Jason Ryan (2).mp42.18 GBUnknownView/Open


Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.