Please use this identifier to cite or link to this item:
https://ipweaqbackup.intersearch.com.au/ipweaqjspui/handle/1/7008| Type: | Article |
| Title: | Isolation of a Critical Asset in the Water Supply Network |
| Authors: | Rieck, Craig |
| Tags: | Water Management |
| Issue Date: | 2021 |
| Copyright year: | 2021 |
| Publisher: | Institute of Public Works Engineering Australasia Queensland |
| Abstract: | How do you take the largest water reservoir in your network offline for a period of three months for re-lining? The short answer is you bypass it. The reality (or the long answer) is that is takes 12 months of planning, trials and teamwork to ensure water security. |
| URI: | http://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/7008 |
| Appears in Collections: | Infrastructure (Roads, Water, and Building). |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Craig Rieck Article.pdf | 4.71 MB | Adobe PDF | ![]() View/Open |
Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.
