Please use this identifier to cite or link to this item: https://ipweaqbackup.intersearch.com.au/ipweaqjspui/handle/1/6920
Full metadata record
DC FieldValueLanguage
dc.contributor.authorJohnston, Adam-
dc.date.accessioned2021-04-23T02:52:17Z-
dc.date.available2021-04-23T02:52:17Z-
dc.date.copyright2021en_US
dc.date.issued2021-04-
dc.identifier.urihttps://webcast2.gigtv.com.au/Mediasite/Channel/ipweaq-cq-branch-conference-2021/watch/e56e1e575ec14f6d9e8816e452911bf91d-
dc.identifier.urihttp://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/6920-
dc.description.abstractOn 1 September 2017, Bundaberg Regional Council adopted the ADAC system for As Constructed XMLs provided by the Development Industry. However, ADAC as the name implies is, Asset Design and As Constructed: So why doesn’t our industry provide For Construction (or Design) XML? With this in mind, Bundaberg Regional Council in conjunction with 12d developed a system to create ADAC XML files at the Design or For Construction phase. The next logical question is: if we have ADAC at design and at the as constructed phase where will this process lead? This paper discusses how ADAC can transform from the asset management area to a project management tool.en_US
dc.language.isoenen_US
dc.publisherIPWEAQen_US
dc.titleADAC: Design XML and Beyond - Bundaberg Regional Councilen_US
dc.typeAudio Visual Recordingen_US
Appears in Collections:CQ21: Presentations

Files in This Item:
File Description SizeFormat  
BRC - Adac Presentation - April 2021.pdf2.04 MBAdobe PDFThumbnail
View/Open
CQ Conference Paper - ADAC Design XML and Beyond - A Johnston - April 2021.docx2.98 MBMicrosoft Word XMLView/Open


Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.