Please use this identifier to cite or link to this item:
https://ipweaqbackup.intersearch.com.au/ipweaqjspui/handle/1/3403| Type: | Project Sheet |
| Title: | Upgrade of Existing Infrastructure Under Cape Lambert Rail Line, Rio Tinto, WA |
| Authors: | ITS Pipetech |
| Tags: | Rail Infrastructure |
| Issue Date: | 2017 |
| Copyright year: | 2017 |
| Publisher: | ITS Pipetech |
| Abstract: | ITS PipeTech were engaged by Rio Tinto to renew three corrugated steel arch bridges in WA. The project involved the installation of a stand alone structural lining to the inside of an existing 3 span corrugated steel arch bridge under the main Cape Lambert rail line. Each of the existing arch spans measured 8.0m in width and 4.1m high with a depth of 17.0m. Gaps between the outer and central arches was 0.Sm |
| Description: | Project Sheet |
| URI: | http://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/3403 |
| Appears in Collections: | Company Project Sheets and Corporate Brochures |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Pages from Tunneline - Cape Lambert.pdf | jpeg | 734.57 kB | Adobe PDF | ![]() View/Open |
| Tunneline - Cape Lambert.pdf | 1.02 MB | Adobe PDF | ![]() View/Open |
Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.

