Please use this identifier to cite or link to this item:
https://ipweaqbackup.intersearch.com.au/ipweaqjspui/handle/1/3071| Type: | Article |
| Title: | Soil nailing and Wire Mesh Landslip Repairs: A Case Study |
| Authors: | Hull, Allan |
| Tags: | Soil Nailing;Wire Mesh Landslip Repair |
| Issue Date: | Jun-2016 |
| Copyright year: | 2016 |
| Publisher: | Institute of Public Works Engineering Australasia Queensland |
| Abstract: | An extensive slip occurred on Cooroy Belli Creek Road, Cooroy, during Ex Tropical Cyclone Marcia in February 2015. Following the event, Council commissioned a geotechnical investigation and considered several options for the repair work with the method of soil nailing and wire mesh considered the most appropriate. |
| Description: | Article |
| URI: | http://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/3071 |
| Appears in Collections: | SEQ Articles, Industry Papers and Presentations |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Allan Hull Paper June 2016.pdf | Article | 188.37 kB | Adobe PDF | ![]() View/Open |
Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.
