Please use this identifier to cite or link to this item:
                
    
       
    https://ipweaqbackup.intersearch.com.au/ipweaqjspui/handle/1/3071| Type: | Article | 
| Title: | Soil nailing and Wire Mesh Landslip Repairs: A Case Study | 
| Authors: | Hull, Allan | 
| Tags: | Soil Nailing;Wire Mesh Landslip Repair | 
| Issue Date: | Jun-2016 | 
| Copyright year: | 2016 | 
| Publisher: | Institute of Public Works Engineering Australasia Queensland | 
| Abstract: | An extensive slip occurred on Cooroy Belli Creek Road, Cooroy, during Ex Tropical Cyclone Marcia in February 2015. Following the event, Council commissioned a geotechnical investigation and considered several options for the repair work with the method of soil nailing and wire mesh considered the most appropriate. | 
| Description: | Article | 
| URI: | http://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/3071 | 
| Appears in Collections: | SEQ Articles, Industry Papers and Presentations | 
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Allan Hull Paper June 2016.pdf | Article | 188.37 kB | Adobe PDF |  View/Open | 
Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.
