Please use this identifier to cite or link to this item:
https://ipweaqbackup.intersearch.com.au/ipweaqjspui/handle/1/2791| Type: | PowerPoint |
| Title: | Stormwater Drainage Study Process |
| Other Titles: | Populating a Stormwater Capital Expenditure Program |
| Authors: | Griffith, Peter |
| Tags: | Gold Coast Stormwater |
| Issue Date: | Oct-2015 |
| Copyright year: | 2015 |
| Publisher: | Institute of Public Works Engineering Australasia Queensland |
| Abstract: | : What is a Stormwater Drainage Study (SDS)? Process for delivering a Master Drainage Plan Delivering Stormwater improvements for Capital Works Program Analyses performance of drainage network for Local Flooding Stages deliverables for ‘gateway’ reviews/decisions Stages include…….. |
| Description: | PowerPoint |
| URI: | http://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/2791 |
| Appears in Collections: | SEQ Articles, Industry Papers and Presentations |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Peter Griffith Mackay.pdf | ppt | 6.34 MB | Adobe PDF | ![]() View/Open |
Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.
