dc.descriptionPowerPoint Presentationen_US
dc.description.abstractBackground Scope • Stage 1 – Construction Activities  Site facilities  Setting out of works  Temporary erosion and sediment control  Clearing and grubbing  Remove and stockpile topsoil  Earthworks on leads  Scarify surface of bulk earthworks  Remove and place topsoil from stockpile  Boundary fencing around protected vegetation • Preconstruction Advice  Theoretical zero balance of cut to fill  Assumed clean site – minimal unsuitable material  Water available on site - Dam and bore on site • Initial Estimate  Approx. $5 M (Risk – Commercial perspective)  Revised to $2.15 M • Delivery  Stage 1 Deadline – 31 May 2015en_US
dc.publisherInstitute of Public Works Engineering Australasia Queenslanden_US
dc.subjectBulk Earthworksen_US
dc.titleHighfields Sports Precinct Projecten_US
dc.typePowerPointen_US
Appears in Collections:SWQ Branch Conference Toowoomba 2015

Files in This Item:
File Description SizeFormat  
Lee Busby and Dominic Doyle Toowoomba 2015.pdfppt1.54 MBAdobe PDFThumbnail
View/Open


Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.