Please use this identifier to cite or link to this item: https://ipweaqbackup.intersearch.com.au/ipweaqjspui/handle/1/2052

Full metadata record
DC FieldValueLanguage
dc.contributor.authorCoughlan, Paul-
dc.date.accessioned2017-03-29T04:18:39Z-
dc.date.available2017-03-29T04:18:39Z-
dc.date.copyright2016en_US
dc.date.issued2016-
dc.identifier.urihttp://ipweaq.intersearch.com.au/ipweaqjspui/handle/1/2052-
dc.descriptionPPTen_US
dc.description.abstractA report on the development challengers in building a 2nd runway at Brisbane Airport by Paul Coughlan.en_US
dc.publisherInstitute of Public Works Engineering Australasia Queenslanden_US
dc.subjectGeotechnical Infrastructureen_US
dc.subjectBrisbane Airport 2nd Runwayen_US
dc.titleGeotechnical Challenges with the Brisbane Airport 2nd Runway by Paul Coughlanen_US
dc.title.alternativeNEW PARALLEL RUNWAY PROJECTen_US
dc.typePowerPointen_US
Appears in Collections:2016 IPWEAQ Annual Conference Proceedings (POWERPOINT PRESENTATIONS)

Files in This Item:
File Description SizeFormat  
03 Coughlan.pptxPPT43.41 MBMicrosoft Powerpoint XMLView/Open
Pages from 01 Coughlan.jpg150.12 kBJPEGThumbnail
View/Open


Items in the Knowledge Centre are protected by copyright, with all rights reserved, unless otherwise indicated.